arXiv preprint ·

An EPTAS for Offline Temporary Tasks Assignment on Few Machines

Junho Hwang

Published
Source
arXiv preprint, posted before peer review
Original
Read it at arXiv
Topics
Data Structures & AlgorithmsComputational Complexity

Abstract

In offline temporary tasks assignment, each job has a time interval and a positive weight and is assigned to one of $r$ identical machines for its entire interval; the goal is to minimize the peak load, the largest total weight of jobs that are simultaneously active on one machine. For every fixed $r$, we give an efficient polynomial-time approximation scheme (EPTAS) with running time $f(r,1/\varepsilon)\cdot N^{O(1)}$, where $N$ is the input length. The previous approximation scheme, by Azar, Regev, Sgall, and Woeginger (2002), runs in time $n^{O(r^3\log r/\varepsilon^3)}$ on $n$ jobs. We also show that for every fixed $r\ge2$ the problem is strongly NP-hard, so it has no FPTAS unless P=NP, and that under the Exponential Time Hypothesis no deterministic $(1+\varepsilon)$-approximation runs in time $2^{o(1/\varepsilon)}\cdot N^{O(1)}$. The key idea is to bound the loads of each group of simultaneously active jobs by a few weighted intervals whose positions are fixed in advance; a dynamic program over the time line then only has to record which machine carries each interval.

The authors’ abstract, as arXiv lists it. arXiv’s listings, abstracts included, are free for anyone to reuse.

Read it on ReadSearch

Each opens after you create an account, and brings you back to this paper.

Already a reader? Sign in

All new papers in Data Structures & Algorithms

Get the few papers worth your time in Data Structures & Algorithms every morning.

ReadSearch reads the new papers in your field each day and brings you the few worth reading, each with its key finding in a sentence.

Papers belong to their authors and publishers; every page here links to the original. All research topics